Preserving trees in Accrington

This summer we added to our eco credentials with a drill in Accrington on a site with a number of protected trees. We were contacted to help with a 26m drill to install drainage. The restrictions of a number Tree Preservation Orders meant that it was imperative that...

New 4X rig – working on a small scale

Working with DACC Europe at their site in Halewood, we used our 4X drilling rig to install fibre optic cables. As with much of our work, we were able to complete this installation without trenching over a distance of 116 meters. The new, smaller profile 4X rig is a...

Quick and Easy in Preston

One of the many advantages of our directional drilling techniques is that we can often complete jobs in a short space of time with minimal impact. Earlier this year we took our new 4X small scale rig to a road crossing near Preston. With no need to dig up the road, we...

JLR site, Halewood

In September 2017, our team have been working at Gertrag which is on the Jaguar Landrover site in Halewood, Liverpool Our client DACC contacted us to ask if we could drill from the security gate house to the main building to install a fibre link. The drill route is...

Tesco Wind Turbines – Mole save the day

in 2011, Tesco were installing a wind turbine at their Northampton Distribution Centre on the edge of the M1. With our own interests in renewable energy and our wide experience in directional drilling, as well as the opportunity to work with a household name, we were...

London 2012

With the London 2012 Olympics rapidly approaching in June 2012, final preparations were key to its success. While the world waited to tune in to the events, a large number of media organisations needed to set up to be able to broadcast globally. The organisers...