Quick and Easy in Preston

One of the many advantages of our directional drilling techniques is that we can often complete jobs in a short space of time with minimal impact. Earlier this year we took our new 4X small scale rig to a road crossing near Preston. With no need to dig up the road, we...

Jaguar Land Rover, Halewood

In September 2017, our team have been working at Gertrag which is on the Jaguar Landrover site in Halewood, Liverpool Our client DACC contacted us to ask if we could drill from the security gate house to the main building to install a fibre link. The drill route is...

Tesco Wind Turbines – Mole save the day

in 2011, Tesco were installing a wind turbine at their Northampton Distribution Centre on the edge of the M1. With our own interests in renewable energy and our wide experience in directional drilling, as well as the opportunity to work with a household name, we were...

London 2012

With the London 2012 Olympics rapidly approaching in June 2012, final preparations were key to its success. While the world waited to tune in to the events, a large number of media organisations needed to set up to be able to broadcast globally. The organisers...

Whitworth Art Gallery

Specialist installation in listed building:  The Whitworth Gallery in Machester underwent a £15million refurbishment in 2014 and Mole Engineering supported the project with the installation of specialist ducting beneath a marble floor. Founded in 1889 Whitworth Art...

Drilling Under the Thames in Reading

We teamed up with Drainage Care UK to install a new pumped drainage pipe from the mainland to Fry’s Island in Reading. It took over 12 months of planning and permissions but in summer 2017 we were ready to go. Fry’s Island, also known as De Montfort...