Jaguar Land Rover, Halewood

In September 2017, our team have been working at Gertrag which is on the Jaguar Landrover site in Halewood, Liverpool Our client DACC contacted us to ask if we could drill from the security gate house to the main building to install a fibre link. The drill route is...

Tesco Wind Turbines – Mole save the day

in 2011, Tesco were installing a wind turbine at their Northampton Distribution Centre on the edge of the M1. With our own interests in renewable energy and our wide experience in directional drilling, as well as the opportunity to work with a household name, we were...

London 2012

With the London 2012 Olympics rapidly approaching in June 2012, final preparations were key to its success. While the world waited to tune in to the events, a large number of media organisations needed to set up to be able to broadcast globally. The organisers...

Whitworth Art Gallery

Specialist installation in listed building:  The Whitworth Gallery in Machester underwent a £15million refurbishment in 2014 and Mole Engineering supported the project with the installation of specialist ducting beneath a marble floor. Founded in 1889 Whitworth Art...

Drilling Under the Thames in Reading

We teamed up with Drainage Care UK to install a new pumped drainage pipe from the mainland to Fry’s Island in Reading. It took over 12 months of planning and permissions but in summer 2017 we were ready to go. Fry’s Island, also known as De Montfort...

Rowney Green, Birmingham

Rowney Green is a village outside Birmingham. With 800m of drain to install along a local road, we are sensitive to the inconvenience and disruption these works can cause. The total project distance was 800m of 125mm pumped drain which required 6 stages of drilling....

Keeping things moving at Holywell Hospital

Keeping local traffic moving: One of the many benefits of directional drilling is that busy roads can remain open during work as we go underneath rather than digging up the surface. A recent job near Holywell Hospital in North Wales was a good example of this when our...

Tarka Holiday Park, Barnstable

63mm water pipe installation, Barnstable In April 2016 we completed a new 63mm water pipe installation to connect a large caravan park to the new mains supply around 600m away. The project was completed in 5 drills and to the satisfaction of the farmer whose land the...

Network Link for Vado Cheddar, Somerset

Telecommunications Moling: Vado needed to install a duct for telecommunications between two buildings at their business address in Cheddar, Somerset. Vado is a leading British brassware manufacturer that provides high quality taps, showers, accessories and fittings to...

Worksop Biscuit Factory

Great work at Worksop Biscuit factory completed last week for Tolent Construction The 3no. drill were completed with precision drilling to install the 110mm drains under a reinforced concrete slab. The falls required were very tricky, but the team persevered and when...