UNDERGROUND UTILITIES INSTALLATION

Want to know more? Call Us today

Get In Touch Today

Method: Drill or Mole?

To determine if we will need to drill or mole, the factors we consider are:

  • Ground conditions
  • Distance to cover
  • Launch accessibility
  • Pipe diameter
  • Depth requirement
  • Underground obstructions

Usually it is practical to install all underground services required in one drill or mole shot.

Cost Factors

The bulk of the cost is in the set up of the machines and operatives. Factors we consider when calculating the costs of a job are:

  • Location
  • Ground conditions
  • Preparation required
  • Specialist equipment required

Where we are

Wirral
Unit 9, Tarran Way South, Tarran Industrial Estate, Moreton, Wirral, CH46 4TP

North East
Green Mole Northeast, Unit 3 Ayton Workshops, 25 Raby Cross, Commercial Road, Byker, NE6 2FF

London
London Finsbury Square, EC2A 1AD

South West
6 South Wing, Mansion House, Devington, Exminster, Devon, EX6 8UJ

Contact Us

E: [email protected]

P: 0333 335 9929

North West

North East

London

South West

We Work Nationwide