Take a look at our wide range of expert Directional Drilling and Moling work

 

 

Oulton Park Race Track

Installation of cable ducts were required under the race track for arobust system of new marshalling cameras.
The primary objective was to cut costs and improve accuracy by automating the camera/photo recording system.

Tesco Wind Turbines

Tesco required two 160mm ducts for power cables from its’ new wind turbine at its’ Northampton distribution centre on the edge of the M1. The ducts needed to be installed under the reinforced concrete road to the entrance of the ware house for the use of the delivery trucks.