Jun 23, 2021 | Case Studies, Directional Drilling
Project: Mole Group were asked to install new electrical power cables to a new development of properties under a manège (an enclosed area in which horses and riders are trained), driveway and field. Objective: As the manège had been laid to a very particular...
Feb 5, 2021 | Case Studies, Directional Drilling
Car Charge Point Install, Westminster “Not having to search for an available charge point has been absolute bliss – especially in the cold weather! We are delighted we finally managed to get this process through.” A customer in a beautiful part of London wanted...
Jan 25, 2021 | Case Studies, Directional Drilling
Network Cable Installation for a School in South Wales Replacing badly damaged overhead network cables This school campus required careful planning as the buildings were separated by a grass verge with a dropped wall, down to an outdoor eating area and another stepped...
Aug 14, 2020 | Case Studies, Directional Drilling
Electrical Cable Installation At New Aldi Store in RuthinWelcome news for the Ruthin area that work has begun on construction of a new Aldi store. Mole Group Utilities were delighted to be involved with Jennings Building and Civil Engineers on this project. So why...
Jun 2, 2020 | Case Studies, Directional Drilling
Electricity power supply cabling underground installation for Vitacress in AndoverDid you know that healthy green watercress thrives in clean flowing water? Or that fresh food growers Vitacress grow herbs, rocket and spinach as well as watercress? Ducting...
Nov 13, 2019 | Case Studies, Directional Drilling
Greggs Newcastle - a challenging trenchless pipeline installation for a major bakery in the North East. 80m trenchless pipeline installation under a busy commercial goods yard CHALLENGE Our client, Lindum Group, was facing the challenge of installing a fire...