A recent customer was an Art Gallery who needed underground networking cables to improve their communications systems. This required 2 x 6m drills to go under a marble floor. As little disruption as possible was required to both the environment and flow of public through the doors. The photos illustrate well our neat small set up. The job was neatly completed in 2 days and provided some constructive on the job training for our apprentice. He even smiles sometimes and looks really nice. Although not quite one of the art works!