Rerouting Drainage Beneath Meadow Springs Country and Leisure Park

G F Grigg Construction Ltd contacted us as they had to reroute the drains beneath a road and stream as part of a much wider project to prepare for a fantastic holiday park.

Planning & Drilling

Having surveyed the site for accessibility we made a neat excavation at either end of the installation to send and receive the pipe (shown in deep mud on our pictures!). Using our small but powerful drill rig, we horizontally drilled a distance of 50m beneath land and water to a depth of 4.3m to bring 90mm duct through for the rising main.

Whilst the mud wasn’t too kind on our overalls due to the heavy rainfall, it was lovely and soft for our drill rig! Once the preparation and set up had been carried out, the final installation was done in a day and our happy client, along with the Mole team, could go home to dry out.

Contact Us

Our Operations Team will discuss your project with you and arrange a site visit if required. Once we understand the job we can propose a solution and give you a quote – email or call us to get the ball rolling!

Directional Drilling Experts

Where we are

 

Mole HQ, Wirral
Mole Group Utilities Ltd, 180-200 Pensby Road, Heswall, Wirral, CH60 7RJ

Manchester
Piccadilly Business Centre, Aldow Enterprise Park, Manchester, M12 6AE

North East
Unit 3 Ayton Workshops, 25 Raby Cross, Commercial Road, Byker, NE6 2FF

London
33 Finsbury Square, London, EC2A 1AD

South West

4 Staffick Close, Kenton, Exeter, EX6 8NS

Wales
Fronfellen House, Corris, SY20 9TF

Contact Us

 

North West

North East

London

South West

Wales

A UK-Wide Service