Drilling at Art Gallery
A recent customer’s business was an Art Gallery that needed underground networking cables to improve its communications systems. This required 2 x 6m drills to go under a marble floor. As little disruption as possible was required to both the environment and the flow of public through the doors. The photos illustrate well our neat small set-up. The job was neatly completed in 2 days and provided some constructive on the job training for our apprentice. He even smiles sometimes and looks really nice. Although not quite one of the artworks!