Ducting Under Mature Trees
Mole Utilities were contacted by SMR Utilities as they had been approached to supply and install MDPE RED ducting under a mature hedgerow/trees in Blackburn, for their end client.
Due to the cost and disruption which would have been caused by an open cut excavation, a trenchless option was selected by the end client for a seamless installation.
Mole Group were able to successfully install around 30m of 160mm OD MDPE RED ducting including the supply and weld of the pipework.