New Drainage Installation, Finmere

Mole Utilities were contacted to help install a rising main to enable a new service station to open up. As an isolated and disused site there was no existing provision for waste.

The requirement was for 1no 90mm MDPE SDR11 pipe to be installed deep below public land in Buckingham. We utilised our smaller 4X drilling rig for this particular installation due to its compact size and versatility.

HDD can be seen as one of the most efficient methods of the installation of pipework particularly in areas where it would be impractical to open cut. It is also one of the most environmentally friendly solution as there is little to no waste.

Mole Utilities were successful in the installation of around 300m of 90mm MDPE ducting ready for the connection for the new pumping station.

We have seen an influx of enquiries for similar works as more and more pumping stations are being introduced, could we offer a trenchless solution for your next project?

Next
Next

Solar Cabling at Petroleum Storage Depot, Bristol