Rowney Green, Birmingham
Rowney Green is a village outside Birmingham. With 800m of drain to install along a local road, we are sensitive to the inconvenience and disruption these works can cause.
The total project distance was 800m of 125mm pumped drain which required 6 stages of drilling. Ground conditions were by no means perfect, but our experienced drilling team completed the work three days ahead of schedule.
Working in conjunction with GB Civils, our team received excellent feedback, minimising disruption to road users and local residents. Both the client and the local residents are happy with progress on site.